Angyalföld sewage pump station. The pumping station was built in between 1936 and 1944. Today's structure, undergoing several reconstructions, was developed for the year 2001. Until 1998, the pumping station operated as an end-point pumping station, Since 1998, it has been channelling the waters to be purified through twin pressure tubes to the North Pest Wastewater Treatment Plant. The pumping station is based in Rákosvölgyi (Rozsnyai Street), Újpest (Cherhalom Street and Váci Street treats waste water from the main collector tube north and south) and the collector tube on József Jakab Street - 6 (or 4) Vizafogó Street, Vizafogó neighbourhood, 13th district of Budapest.
Magyar:
Fővárosi Csatornázási Művek Zrt. Angyalföldi szivattyútelep Budapest nagyobb kapacitású szivattyútelepének egyike. Info: fcsm.hu Dny felől a FCSM Zrt. sporttelep és lakópark ingatlan beépítetlen része határolja - Budapest, XIII. kerület, Vizafogó városrész, Vizafogó utca 6 máshol 4 szám
megoszthatod – szabadon másolhatod, terjesztheted, bemutathatod és előadhatod a művet
feldolgozhatod – származékos műveket hozhatsz létre
Az alábbi feltételekkel:
Nevezd meg! – A szerzőt megfelelően fel kell tüntetned, hivatkozást kell létrehoznod a licencre és jelezned kell, ha a művön változtatást hajtottál végre. Ezt bármilyen észszerű módon megteheted, kivéve oly módon, ami azt sugallná hogy a jogosult támogat téged vagy a felhasználásod körülményeit.
Így add tovább! – Ha megváltoztatod, átalakítod, feldolgozod ezt a művet, a közreműködésedet csak az eredetivel megegyező vagy hasonló licenc alatt terjesztheted.
Ez a kép járulékos adatokat tartalmaz, amelyek feltehetően a kép létrehozásához használt digitális fényképezőgép vagy lapolvasó beállításairól adnak tájékoztatást. Ha a képet az eredetihez képest módosították, ezen adatok eltérhetnek a kép tényleges jellemzőitől.